3D modelling of process and piping installations
Process pipework, utilities, supports and relevant structural elements modelled with attention to slope, drainage, cleanability and service access.
Industry solution
3D modelling, BIM coordination and production documentation for process and piping installations. On a single work package or across the full project.

Pharmaceutical production facilities place sharp demands on installation density, cleanability and documentation. Pipework has to be cleanable, serviceable and traceable, and the interfaces between process, services and building are tight from the outset.
Stelar works on building services and process installations in pharmaceutical production facilities in Denmark. We know what process pipework, prefabrication and handover documentation require in this sector, and we step in where the need is greatest.
We can take on a defined work package, for example detailed design and spool breakdown of a process piping system, or combine several disciplines around one deliverable from early design through to as-built. The scope follows how the project is organised.
Process pipework, utilities, supports and relevant structural elements modelled with attention to slope, drainage, cleanability and service access.
Clash detection across process, services and structure, including penetrations and interfaces towards cleanrooms and plant rooms.
Quantity take-offs and structured schedules for estimating and procurement, built so material selections can be traced from model to spool.
Spool breakdown, isometrics, weld numbering and installation drawings ready for the workshop and the site.
Interface management, follow-up and a documentation set that stays with the deliverable through to handover.
Stelar can step in at a single point or stay with the deliverable throughout. The entry points below can be selected individually or combined.
The sequence below describes a typical technical delivery for process and piping installations and is not tied to a specific project.
01
Review of P&IDs, line lists and discipline models. Agreement on level of detail, system breakdown, naming and material specifications. Setup of model structure, pipe catalogues and templates.
02
Modelling of process pipework and utilities with slope and drainage where the system requires it, and with room for cleaning, operation and service. Coordination of penetrations and interfaces towards cleanrooms, plant rooms and structure. Continuous clash checking against other disciplines.
03
Spool breakdown accounting for transport, installation sequence and access routes. Isometrics with weld numbering, material and component schedules, so it is unambiguous what is to be procured, welded in the workshop and assembled on site.
04
Resolving queries during installation, incorporating changes and updating the model and drawings so the documentation reflects the installed plant at handover.
Do you have a specific work package or project phase in mind? Let us discuss how Stelar can fit in.